Standard Operating Procedure Avaliable

  • Fabrication Procedure
  • Welding Procedure For GTAW & SMAW Process
  • Procedure For Liquid Penetrant Testing
  • Procedure For Radiography
  • Procedure For NON – Destructive
  • Procedure For Hydro Testing
  • Procedure For Pneumatic Testing
  • Procedure For Surface Preparation
  • Painting Procedure
  • Procedure For Rubber Lining

Inhouse Testing Facility

  • Mechanical Testing
  • Tensile Test As Per
  • Hardness Test
  • Bend Test
  • Impact Test
  • Spectro Analysis
  • Wet Analysis
  • PMI Testing

Technical Documents Maintained

  • Design Calculation
  • Detailed Engineering Drawing
  • Quality Assurance Plan
  • Material Identification Reports ( With Mill TC & Lab TC)
  • WPS, PQR, WPQ
  • Welding & NDE Map
  • Welding & NDE Inspection Reports
  • Liquid Penetring Testing Report
  • Radiography Testing Report
  • Final Dimentional Report
  • Hydrostatic Report
  • Pneumatic Test Report
  • Instrument Calibration Report
  • Surface Preparation Report
  • Visual Inspection & Assembly Report

Design Standard Followed​

  • ASME – American Society Of Mechanical Engineers
  • BS – British Standard
  • DIN – Deutsches Institut Für Normung
  • API – American Petroleum Institute